Wednesday, October 31, 2007

Ok, here's what we're tiling

So here is Steve, after building tub surround, as we tested to make sure the bathtub will fit. It will! And that's our tub! This was the first time we got a sense of what the bathroom is going to be like. It's going to be nice. There will be a glass wall on the curb, between Steve and the shower. The wall to the right will not be tiled, it is where the sink and vanity will be, and a big kind of cabinet right when you walk into the bathroom.


And here is a view from Steve's position, sitting on the toilet. The wood soffit will be painted, not tiled. The column in the corner will now be the pretty glass tile, which will also be a 6 inch band going around the near-top of the room. The walls and top of the tub will be white. The floor, and sides of the tub, will be brown. We were putting up durock from 6pm until 10 pm Friday, 7am to 9pm Saturday (well, also doing other things like prying up the durock that we'd put on the floor since the tilers are going to mud in the floor tile), and Steve was working Sunday and I finished things off for three focussed hours on Sunday evening.

Here's the tile itself, and a closeup of the shower. That shower pan took 6 months to build. Six. It would take a professional half a day probably.

We were going to have the glass tile on the shower floor, but Tiler Charlie says that's not going to work, so now we're doing brown on the shower floor. Brown will also be the floor tile in general, and go up the sides of the tub. The top of the tub and walls are the white long tile, and then the glass tile will be an accent -- as mentioned, a band around the room and then a column.

It is already so much better than last week: Remember? Toilet in center of room. Temporary bathtub on left. Nasty rug only slightly better than nasty plywood subfloor, no sink. We really lived like that for, three years?

1 comment:

khanabaaz said...

How is the new year going? I hope to read more interesting posts like last year tilers tadworth